South Energy was appointed as the Solar developer for the installation of 651 kWp grid tied solar plant ( Roof mounted & Car park ) for allied transport facility.
South Energy scope includes feasibility, Engineering , Procurement and Construction.
This project resulted in 100% offset of the facility energy consumption.
Project Location: Allied Transport Facility – DWC
Client: Allied Transport Company
Clean Solar Energy: 930 MWh p.a.
Cost Savings: 0.420Mn AED p.a.
Carbon Emissions Abetment: 420 tCO2eq